Kinda  Hydropower Plant

1

Location

 Myitthar Township, Mandalay Region

2

Creek

Panlaung

3

Construction Starting Date

1981

4

Commercial Running Date

1985

5

Installed Capacity

56 MW (28 MW × 2 )

6

Rated Head 

183.7 ft

7

Type of Turbine 

Francis (Vertical)

8

Discharge

2 × 1976 ft3/s = 3952 ft3/s

9

Annual Design Generation

165 GWh

10

Transmission Line

132 kV Thazi Line (48.4) miles

132 kV Kinda-Ingon  Line (32.2) miles

11 kV Ywangan Line (11) miles

11 kV Mong Maw Line (16) miles

11

Penstock

100 ft (f - 10.5 ft)

Kinda


Sedawgyi  Hydropower Plant

1

Location

 Myitthar Township , Mandalay Region

2

Creek

Chaung Ma Gyi

3

Construction Starting Date

June, 1984

4

Commercial Running Date

6th June 1989

5

Installed Capacity

25 MW (2 × 12.5 MW)

6

Rated Head 

92.63 ft

7

Type of Turbine 

Kaplan (Vertical)

8

Discharge

2 × 1592.5 ft3/s = 3185 ft3/s

9

Annual Design Generation

134 GWh

10

Transmission Line

132 kV Mandalay Line (36.75) miles

132 kV Kyaukpahtoe Line (131.6) miles

11

Penstock

150 ft (f - 14 ft)

Sedawgyi


Yeywa Hydropower Plant

1

Location

 Kyaukse Township, Mandalay Region

2

Creek

Myitnge (Dote Hta Wati)

3

Construction Starting Date

2001-2002

4

Commercial Running Date

2010

5

Installed Capacity

790 MW (4 × 197.5 MW)

6

Rated Head 

299 ft

7

Type of Turbine 

Francis (Vertical)

8

Discharge

4 × 7420 ft3/s = 29680 ft3/s

9

Annual Design Generation

3550 GWh

10

Transmission Line

230 kV Yeywa-Belin Line (1) & (2) (24) miles

230 kV Yeywa-Meiktila Line (1) & (2) (74) miles

11

Penstock

492 ft (f - 22 ft)

Yeywa


Kyaukse Thermal Power Plant  (IPP Rental)

1

Location

Kyaukse Township, Mandalay Region

2

Company Name

Alstom Power Rental Energy Holding Co., Ltd

3

Project Type

BOT

4

Commercial Running Date

23.4.2014

8.3.2015

5

Total Installed Capacity

102 MW

6

Installed Capacity

82  MW ( Phase I) (Gas Engine) Rental

20 MW (Phase II)

7

Type of Turbine 

 XQ 1475 Q, Caterpillar / US

8

Annual Design Generation

706.248  GWh

 

Kyaukse


Myingyan Thermal Power Plant  (IPP Rental)

1

Location

Myingyan  Township, Mandalay Region

2

Company Name

Aggreko International Project  Co., Ltd

3

Project Type

Rental (20) Months

4

Commercial Running Date

10.4.2015

5

Total Installed Capacity

95 MW

6

Type of Machine 

 Cummins, N HC20/  QSK60 (Plus  model) / UK

7

Annual Design Generation

332.10 GWh

Myingyan

 

26-Dec-2017