1 |
Location |
− |
Myitthar Township, Mandalay Region |
2 |
Creek |
− |
Panlaung |
3 |
Construction Starting Date |
− |
1981 |
4 |
Commercial Running Date |
− |
1985 |
5 |
Installed Capacity |
− |
56 MW (28 MW × 2 ) |
6 |
Rated Head |
− |
183.7 ft |
7 |
Type of Turbine |
− |
Francis (Vertical) |
8 |
Discharge |
− |
2 × 1976 ft3/s = 3952 ft3/s |
9 |
Annual Design Generation |
− |
165 GWh |
10 |
Transmission Line |
− |
132 kV Thazi Line (48.4) miles 132 kV Kinda-Ingon Line (32.2) miles 11 kV Ywangan Line (11) miles 11 kV Mong Maw Line (16) miles |
11 |
Penstock |
− |
100 ft (f - 10.5 ft) |
1 |
Location |
− |
Myitthar Township , Mandalay Region |
2 |
Creek |
− |
Chaung Ma Gyi |
3 |
Construction Starting Date |
− |
June, 1984 |
4 |
Commercial Running Date |
− |
6th June 1989 |
5 |
Installed Capacity |
− |
25 MW (2 × 12.5 MW) |
6 |
Rated Head |
− |
92.63 ft |
7 |
Type of Turbine |
− |
Kaplan (Vertical) |
8 |
Discharge |
− |
2 × 1592.5 ft3/s = 3185 ft3/s |
9 |
Annual Design Generation |
− |
134 GWh |
10 |
Transmission Line |
− |
132 kV Mandalay Line (36.75) miles 132 kV Kyaukpahtoe Line (131.6) miles |
11 |
Penstock |
− |
150 ft (f - 14 ft) |
Sedawgyi
1 |
Location |
− |
Kyaukse Township, Mandalay Region |
2 |
Creek |
− |
Myitnge (Dote Hta Wati) |
3 |
Construction Starting Date |
− |
2001-2002 |
4 |
Commercial Running Date |
− |
2010 |
5 |
Installed Capacity |
− |
790 MW (4 × 197.5 MW) |
6 |
Rated Head |
− |
299 ft |
7 |
Type of Turbine |
− |
Francis (Vertical) |
8 |
Discharge |
− |
4 × 7420 ft3/s = 29680 ft3/s |
9 |
Annual Design Generation |
− |
3550 GWh |
10 |
Transmission Line |
− |
230 kV Yeywa-Belin Line (1) & (2) (24) miles 230 kV Yeywa-Meiktila Line (1) & (2) (74) miles |
11 |
Penstock |
− |
492 ft (f - 22 ft) |
1 |
Location |
− |
Kyaukse Township, Mandalay Region |
2 |
Company Name |
− |
Alstom Power Rental Energy Holding Co., Ltd |
3 |
Project Type |
− |
BOT |
4 |
Commercial Running Date |
− |
23.4.2014 8.3.2015 |
5 |
Total Installed Capacity |
− |
102 MW |
6 |
Installed Capacity |
− |
82 MW ( Phase I) (Gas Engine) Rental 20 MW (Phase II) |
7 |
Type of Turbine |
− |
XQ 1475 Q, Caterpillar / US |
8 |
Annual Design Generation |
− |
706.248 GWh |
1 |
Location |
− |
Myingyan Township, Mandalay Region |
2 |
Company Name |
− |
Aggreko International Project Co., Ltd |
3 |
Project Type |
− |
Rental (20) Months |
4 |
Commercial Running Date |
− |
10.4.2015 |
5 |
Total Installed Capacity |
− |
95 MW |
6 |
Type of Machine |
− |
Cummins, N HC20/ QSK60 (Plus model) / UK |
7 |
Annual Design Generation |
− |
332.10 GWh |