MINISTRY OF ELECTRIC POWER

Breaking News :

Bago Division


Under Construction Projects of Line and Substations in Bago Division

No

Name of Projects

Substation

MVA

Location

1

230kV Saparkywei – Taungoo Line (9.5) miles and 230kV Toungoo Substation (2) Bays extension

230kV Taungoo (2)Bays extension

230/33/11kV,

(3x20) MVA

Bago Division  (Taungoo Township , Oktwin Township)

2

500kV Kankaung (Meiktila)- Saparkywei (Taungoo)  Transmission Line  Part II (72.51)Miles and 500kV Saparkywei Substation

500kV Saparkywei Substation

(1x500 MVA)

500/230/33kV,

(1x500)MVA

Nay Pyi Taw (Ottarathiri Township , Dekkhina Thiri Township , Lewe Township) Bago Division  (Taungoo Township, Yedashe Township)

3

500kV Taungoo-Phayargyi (Kamarnat) Transmission Line (108.34) Miles and 500kV Phayargyi Substation

500kV Phayargyi

Substation

(2x500 MVA)

500/230/33kV,

(2x500)MVA

Bago Division  (Taungoo Township , Oktwin Township ,Phyu Township , Kyauktagar Township , Daik-U Township ,Bago Township )

4

500kV Phayargyi –Hlaing Tharyar Transmission Line (14) miles

-

-

(Bago Division ,Bago Township)

5

230kV Phayargyi(Kamarnat)-Myaungtagar

Transmission Line (23)miles

-

-

(Bago Division ,Bago Township)

6

230kV, (150) MVA Kamarnut Substation (New) In/ Out (Diversion) Transmission (1.283) miles

230/66/11kV, (150) MVA Kamarnut Substation (Extension)

(150) MVA

Bago Region, 

Kamarnut Township 

7.A

230kV Minhla – Athoke Transmission Line (101) miles 

230kV Switch Bay (3) Nos.Extension at Minhla Substation

230kV Switch Bay (2) Nos. Extension at Athoke Substation

(150) MVA

Bago Region,

Minhla Township

Ayeyarwaddy Region, 

Athoke Township

7.B

230kV Minhla Switchyard foundation & Fence

230/66 kV Transformer Plinth   Foundation

66kV Switchyard Bay Extension outgoing bay, bus bay, measuring bay, outgoing feeder (3) bays

(150) MVA

Bago Region,

Minhla Township

 

230kV Saparkywei - Taungoo Transmission Line (9.5) miles and

230kV Taungoo Substation (2) Bays Extension

1.  Location                                                      -  Bago Division , (Taungoo Township , Oktwin Township)

2.  Scope of Work           

          (A)  Line                                                  -   (9.5) miles

          (B)  Substation                                        -   230kV Switch Bay (2)Bays

3.  Situation of Signing Contract

          (A) Line

               Construction                                       -  Project Manager (2) Office, Tharyargone (PTP)

               Contract No. & Date(Materials)         -   59/ DPTSC(PTP)/2019-2020 (3.6.2020)

               Contractor                                          -  Khin Maung Nyunt Co.,Ltd

          (B) Substation

              Construction                                      -   Project Manager (2) Office, Tharyargone (PTP) & Project Manager (Civil) Southen

              Contract No. & Date(Materials)         -   83/ DPTSC(PTP)/2019-2020 (28.4.2020)

               Contractor                                        -   Aye Chan Mon Co.,Ltd

4.  Starting Date of Project (Effective date) -  Line              -       (1.2.2020)

                                                                           Substation     -       (20.12.2020)

5.  Ending Date of Project (Approximation) - Line              -       June, 2022

                                                                           Substation     -       November,2021

6.  Complete Situation                                    -  Line             -       (100%)      

                                                                            Substation    -       (100%)

230kV Saparkywei - Taungoo Transmission Line (9.5) miles

230kV Taungoo Substation (2) Bays Extension

 

500kV Kankaung (Meiktila) – Saparkywei(Taungoo) Transmission Line Part II (72.51) miles and 500kV Saparkywei Substation

 

1.  Location                                                                  -   Nay Pyi Taw (Ottarathiri Township,Dekkhina Thiri Township ,

                                                                                          Lewe Township) Bago Division  (Taungoo Township , Yedashe Township)  

2.  Scope of Work                   

          (A)  Line                                                              -   (72.51) miles

          (B)  Substation                                                   -    500/230/33kV (500MVA) x 1banks Tr

                                                                                          500/230/33kV 100MVAR Shunt Reactor ( 4 Unit)

  3.  Situation of Signing Contract

          (A)  Line

                Contract No. & Date(Stringing)                      -   3/DPTSC(PTP)/2018-2019 (26.12.2018)

               Contractor                                                       -   SEPCO Co.,Ltd

               Contract No. & Date(Foundation & Erection)  -   295/DPTSC(PTP)/2013-2014 (25.1.2018)

               Contractor                                                        -   Dragon Emperor Co.,Ltd

                Contract No. & Date(Foundation & Erection) -   296/DPTSC(PTP)/2013-2014 (16.7.2015)

               Contractor                                                       -   Minanawrathar Co.,Ltd

               Contract No. & Date(Foundation & Erection)  -   297/DPTSC(PTP)/2013-2014 (14.7.2015)

               Contractor                                                       -   Chan Hein Co.,Ltd

               Contract No. & Date(Foundation & Erection)  -   298/DPTSC(PTP)/2013-2014 (25.1.2018)

               Contractor                                                       -   Khin Maung Nyut Co.,Ltd

                Contract No. & Date(Instruction Service)      -   28/DPTSC(PTP)/2018-2019 (14.2.2019)

               Contractor                                                      -   KEPCO Co.,Ltd

                Contract No. & Date(Supply of ACSR)         -   37/DPTSC(PTP)/2018-2019 (11.3.2019)                                                                   

                  Contractor                                                   -   Zeya & Associates Co.,Ltd

            (B)   Substation                                                          

                Contract No. & Date                                     -   57/DPTSC(PTP)/2019-2020 (6.3.2020)

               Contractor                                                     -   Marubeni Corporation

4.  Starting Date of Project (Effective date)             -   Line             -    (26.12.18)

                                                                                         Substation  -   6.3.2020

5.  Ending Date of Project (Approximation)            -   Line            -   October, 2023   

                                                                                         Substation  -  September,2022

6.  Complete Situation                                               -  Line            -     100 %

                                                                                         Substation  -    24.19 % (Civil Work)

500kV Kankaung (Meiktila) – Saparkywei(Taungoo) Transmission Line (72.51) miles

              500kV Saparkywei Substation

 

500kV Taungoo-Pharyargyi (Kamanat) Transmission Line (108.34) Miles and Substation

1.  Location                                                    -  Bago Division , (Taungoo Township , Oktwin Township , Phyu Township ,

                                                                            Kyauktagar Township , Daik-U Township , Bago Township )

2.  Scope of Work       

     (A) Line                                                      -   (108.34) miles

     (B) Substation                                            -   500/ 230 kV (500 MVA) x 2 banks Tr

                                                                             500kV 100MVAR Shunt Reactor (2 Unit) 

3.  Situation of Signing Contract

     (A) Contract No. & Date                            -   56/ DPTSC(PTP)/ 2018-2019 (25.6.2019)

          Contractor                                            -   Doosan Engineering & Construction Co.,Ltd

      (B)  Substation                                                                 

          Contract No. & Date                             -    3/DPTSC(PTP)/2019-2020 (18.12.2019)

          Contractor                                            -    (Sojitz Co.,Ltd)

4.  Starting Date of Project(Effective date) -    Line          - (25.6.2019)

                                                                         -  Substation - (16.1.2020)

5.  Ending Date of Project (Approximation) -   Line          - June, 2023

                                                                         -  Substation - (15.1.2023)

6.  Complete Situation                                    -  Line          - (92.225%)

                                                                         -  Substation - (10.6%) (Civil Work)

500kV Toungoo-Pharyargyi (Kamanat) Transmission Line (108.34)Miles    

Pharyargyi Substation

 

 500kV Phayargyi – Hlaing Tharyar Transmission Line (14) miles

1.  Location                                                     -  Bago Division , (Bago Township)

2.  Scope of Work           

          (A)  Line                                                 -  (14) miles          

3.  Situation of Signing Contract 

          (A) Line                

         Contract No. & Date                       -  3/DPTSC(PTP)/2019-2020 (18.12.2019)

                 Contractor                                       -   Mitsubishi Coporation                        

4.  Starting Date of Project (Effective date) -   Line     - (16.1.2020)

5.  Ending Date of Project (Approximation) -  Line     - (15.7.2022)

6.  Complete Situation                                    -  Line     - (79.94 %)   

500kV Phayargyi – Hlaing Tharyar Transmission Line

 

230kV Phayargyi (Kamarnat) - Myaungtagar Transmission Line (23)miles

1.  Location                                                     -   Bago Division , (Bago Township ) Yangon Division , Hlaing Tharyar Township

2.  Scope of Work           

          (A)  Line                                                  -   (23) miles

3.  Situation of Signing Contract

          (A) Line

               Contract No. & Date(Materials)         -  10/DPTSC(PTP)/2021-2022 (9.3.2022)

               Contractor                                         -  The Consortium of  Kanaung  & Integral Power Transmission Group Co,Ltd

4.  Starting Date of Project (Effective date) -  Line              -   (9.3.2022)

5.  Ending Date of Project (Approximation) - Line               -  (9.3.2024)

6.  Complete Situation                                   -  Line              -   (48.13%)      

230kV Phayargyi(Kamarnat)-Myaungtagar Transmission Line (23)miles

 

230/66/11kV, (150) MVA Kamarnut Substation (Extension)

1.  Location                                                     -   Bago Division (Front), Kamarnut Village

2.  Scope of Work           

          Substation                                                             

             230kV Incoming Bay                           -  4 Bays

             230kV Transformer Bay                      -  1 Bay

             230kV Bus Coupler Bay                     -  1 Bay

             230kV Measuring Bay                         -  2 Bays

             66kV Incoming/Main                           -   1 Bay

             66kV Outgoing Bay                             -   5 Bays

             66kV Measuring Bay                           -   1 Bay

3.  Situation of Signing Contract

          Contract No.&Date(Construction)           -   Project Manager(3)+(Civil) Southen

          Contract No.& Date(Materials)               -   73(T)/ESE/2019-2020 (4.2.2020)

          Contractor(Materials)                             -   Zillion Luck Engineering Co.,Ltd               

          Contractor(Transformer)                        -   KhinMaungNyuntCo.,Ltd

4.  Starting Date of Project (Effective date) -   (15.1.2021)     

5.  Ending Date of Project (Approximation) -   (31.10.2022)

6.  Complete Situation                                

          Switchyard foundation (Civil Work)        -   (100%)

          Substation (Installation)                         -   (78.8 %)

 

      230/66/11kV, (150) MVA Kamarnut Substation (Extension)

 

(A) 230kV Minhla – Athoke Transmission Line (101) miles and Minha &

Athoke Substations Extension

1.  Location                                             :-  Bago and Ayeyarwaddy Region

2.  Scope of Work                                    -     

     (A) Line                                                -   101 miles

     (B) Substation                                    -                                 

                                                                 -   230kV Switch Bay (3) Nos.Extension at Minhla Substation

                                                                 -   230kV Switch Bay (2) Nos. Extension at Athoke Substation

3.  Situation of Signing Contract

          Line/ Substation

          Construction                                  -    Khin Maung Nyunt TradingCo.,Ltd. and TBEA   Co.,Ltd.                                                                

           Contract No.& Date(Materials)     -    95/DPTSC (PTP)/2019-2020 dated 09.07.2020

           Contractor                                    -    Consortium of Khin Maung Nyunt Trading Co.,Ltd. and TBEA Co.,Ltd.

 4.  Contract Effective Date of Project  -     10.08.2020

5.  Completion Date of Project              -      09.08.2023 

      (Approximation)    

6.  Complete Situation

           Transmission Line                         -    0 % (Finalized Line Route, Tower  Type F approved)

           Substation                                     -    0 %

(B) 230kV Minhla Switchyard foundation & Fence

1.  Location                                             - :  Bago Region.

2.  Scope of Work                                   -           

                                                                 -   230/66 kV Transformer Plinth   Foundation

                                                                 -   66 kV Switchyard Bay Extension outgoing bay, bus bay, measuring bay,                                                                                          outgoing feeder (3) bays

3.  Situation of Signing Contract

          Substation

                Construction                             -   Power Heaven Co.,Ltd

                Contract No.& Date(Materials) -   81/DPTSC(PTP)/2020-2021 (29.9.2021)

                Contractor                                -    Power Heaven Co.,Ltd

4.  Contract Effective Date of Project  -   10/2021

5.  Completion Date of Project             -    9/2023

               (Approximation)   

6.  Complete Situation

                             Substation                   -   99.2 % (Until (13.2.2023))

(Completion of Work )                                

{Have Concreted Foundation to 66kV Gantry Foundation(6) Nos, GCB Foundation (4) Sets, CT Foundation (4) Sets, LA Foundation (5) sets, DS Foundation (4) sets, DSE Foundation (4) Sets, VT Foundation (1) Set & 230kV Gantry Foundation (4) Nos, CT Foundation (1) Set, GCB Foundation (1) Set, LA Foundation (1) Set, DS Foundation (3) Sets, 66kV Cable Duct & 230kV Cable Duct (100%) completed} { Flooring works are underway}                                

 

            230kV Minhla Substation (66kV Brick Cable Duct,Brick Work & Cable Trench Rail Installation Work, 230kV Cube Bus Concreting Work)