			 1  | 
			
			 Location  | 
			
			 −  | 
			
			 Kyunhla Township, Sagaing Region  | 
		
| 
			 2  | 
			
			 River  | 
			
			 −  | 
			
			 Mue  | 
		
| 
			 3  | 
			
			 Construction Starting Date  | 
			
			 −  | 
			
			 1998  | 
		
| 
			 4  | 
			
			 Commercial Running Date  | 
			
			 −  | 
			
			 2002  | 
		
| 
			 5  | 
			
			 Installed Capacity  | 
			
			 −  | 
			
			 30 MW (3 × 10 MW)  | 
		
| 
			 6  | 
			
			 Rated Head  | 
			
			 −  | 
			
			 62 ft  | 
		
| 
			 7  | 
			
			 Type of Turbine  | 
			
			 −  | 
			
			 Kaplan (Vertical)  | 
		
| 
			 8  | 
			
			 Discharge  | 
			
			 −  | 
			
			 2 × 2228 ft3/s = 6684 ft3/s  | 
		
| 
			 9  | 
			
			 Annual Design Generation  | 
			
			 −  | 
			
			 117.2 GWh  | 
		
| 
			 10  | 
			
			 Transmission Line  | 
			
			 −  | 
			
			 33 kV Thaphanseik-Kantbalu Line (1) (15.21) miles 33 kV Thaphanseik- Ngapyawdaing Line (2) (19.8) miles 132 kV Thaphanseik- Ngapyawdaing Line (36) miles  | 
		
| 
			 11  | 
			
			 Penstock  | 
			
			 −  | 
			
			 1472 ft (f - 20 ft)  | 
		


| 
			 1  | 
			
			 Location  | 
			
			 −  | 
			
			 Kalay Township, Sagaing Region  | 
		
| 
			 2  | 
			
			 Creek  | 
			
			 −  | 
			
			 Nerinzara  | 
		
| 
			 3  | 
			
			 Construction Starting Date  | 
			
			 −  | 
			
			 2003-2004  | 
		
| 
			 4  | 
			
			 Commercial Running Date  | 
			
			 −  | 
			
			 2015-2016  | 
		
| 
			 5  | 
			
			 Installed Capacity  | 
			
			 −  | 
			
			 4 MW (2 × 2 MW)  | 
		
| 
			 6  | 
			
			 Type of Turbine  | 
			
			 −  | 
			
			 Francis (Horizontal)  | 
		
| 
			 7  | 
			
			 Annual Design Generation  | 
			
			 −  | 
			
			 21 GWh  | 
		


												
												
												
												
						
						
																		
																		
																		
																		
	
								
	
								
	
				