MINISTRY OF ELECTRIC POWER

Breaking News :

Sagaing Division


Thaphanseik

1

Location

Kyunhla Township, Sagaing Region

2

River

Mue

3

Construction Starting Date

1998

4

Commercial Running Date

2002

5

Installed Capacity

30 MW (3 × 10 MW)

6

Rated Head 

62 ft

7

Type of Turbine 

Kaplan (Vertical)

8

Discharge

2 × 2228 ft3/s = 6684 ft3/s

9

Annual Design Generation

117.2 GWh

10

Transmission Line

33 kV Thaphanseik-Kantbalu Line (1) (15.21) miles

33 kV Thaphanseik- Ngapyawdaing Line (2) (19.8) miles

132 kV Thaphanseik- Ngapyawdaing Line (36) miles

11

Penstock

1472 ft (f - 20 ft)

Thaphanseik


Yazagyo

1

Location

Kalay Township, Sagaing Region

2

Creek

Nerinzara

3

Construction Starting Date

2003-2004

4

Commercial Running Date

2015-2016

5

Installed Capacity

4 MW (2 × 2 MW)

6

Type of Turbine 

Francis (Horizontal)

7

Annual Design Generation

21 GWh

Yazagyo