MINISTRY OF ELECTRIC POWER

Breaking News :

Magway Division


Mone Chaung

1

Location

Satotaya Township, Magway Region

2

River

Mone

3

Construction Starting Date

1997~1998

4

Commercial Running Date

2004

5

Installed Capacity

75 MW (3 × 25 MW)

6

Rated Head 

124.68 ft

7

Type of Turbine 

Francis (Vertical)

8

Discharge

3 × 2010 ft3/s = 6030 ft3/s

9

Annual Design Generation

330 GWh

10

Transmission Line

132 kV Mone-Chauk Line (61) miles

11

Penstock

450 ft (f - 13.9 ft)

Mone Chaung


Kyeeon Kyeewa

1

Location

 Pwint Phu Township, Magway Region

2

Creek

Mone

3

Construction Starting Date

2002-2003

4

Commercial Running Date

2012

5

Installed Capacity

74 MW (2 × 37 MW)

6

Rated Head 

112.5 ft

7

Type of Turbine 

Kaplan (Vertical)

8

Discharge

2 × 2148 ft3/s = 4296 ft3/s

9

Annual Design Generation

370 GWh

10

Transmission Line

132 kV Minbu Line (43) miles

11

Penstock

No (1) - 853 ft

No (2) - 914 ft

(f -18 ft)

Kyeeon Kyeewa


Myitthar

1

Location

 Gangaw Township, Magway Region

2

River

Myitthar

3

Construction Starting Date

2002-2003

4

Commercial Running Date

9.1.2017

5

Installed Capacity

40 MW (2 × 20 MW)

6

Rated Head 

74 ft

7

Type of Turbine 

Kaplan (Vertical)

8

Discharge

2754 ft3/ Sec

9

Annual Design Generation

170 GWh

10

Transmission Line

66 kV(MyitThar- Gangaw) (14.9) miles Double Circuit

Myitthar


Kyunchaung

1

Location

Pakautku Township, Magwe Region

2

Commercial Running Date

11.3.1974 (Machine -1)

20.3.1974 (Machine-2)

4.6.1974 (Machine -3)

3

Total Installed Capacity

54.30 MW (3 × 18.1MW)

4

Type of Machine 

 JOHN BROWN Mark-I, Frame-5 Gas Turbine

5

Construction Cost

MMK  - 61.6 million

Kyunchaung

 


Mann

1

Location

Minbu Township, Magwe  Region

2

Commercial Running Date

22.8.1980 (Machine -1)

8.12.1980 (Machine-2)

3

Total Installed Capacity

36.90 MW (2× 18.45 MW)

4

Type of Machine 

 GE Frame 5 (Industrial Outdoor Package Type)

5

Construction Cost

MMK -  134.6 million

Mann