1 |
Location |
− |
Yatsauk Township, Shan Sate |
2 |
Creek |
− |
Zawgyi |
3 |
Construction Starting Date |
− |
March 1993 |
4 |
Commercial Running Date |
− |
28th July 1995 |
5 |
Installed Capacity |
− |
18 MW (3 × 6 MW) |
6 |
Rated Head |
− |
383.877 ft (117 m) |
7 |
Type of Turbine |
− |
Francis (Horizontal) |
8 |
Discharge |
− |
3 × 218.73 ft3/s = 656.21 ft3/s |
9 |
Annual Design Generation |
− |
35 GWh |
10 |
Transmission Line |
− |
66 kV Aungthabye Line (50) miles 11 kV Bahtoo Line (11) miles |
11 |
Low Pressure Pipe Line |
− |
902 ft (f - 8 ft) |
12 |
Penstock |
− |
1050 ft (f - 8 ft) |
1 |
Location |
− |
Yatsauk Township, Shan Sate |
2 |
Creek |
− |
Zawgyi |
3 |
Construction Starting Date |
− |
25.9.1995 |
4 |
Commercial Running Date |
− |
1998 |
5 |
Installed Capacity |
− |
12 MW (2 × 6 MW) |
6 |
Rated Head |
− |
106.6 ft |
7 |
Type of Turbine |
− |
Francis (Vertical) |
8 |
Discharge |
− |
2 × 870 ft3/s = 1740 ft3/s |
9 |
Annual Design Generation |
− |
30 GWh |
10 |
Transmission Line |
− |
66 kV Zawgyi (1) Line (17) miles 11 kV Inntaw (8) miles |
11 |
Low Pressure Pipe Line |
− |
105 ft (f - 9.8 ft) |
12 |
Penstock |
− |
320 ft (f - 16.4 ft) |
1 |
Location |
− |
Monage Township, Shan Sate |
2 |
Creek |
− |
Nantein |
3 |
Construction Starting Date |
− |
2003 |
4 |
Commercial Running Date |
− |
2009 |
5 |
Installed Capacity |
− |
54 MW (3 × 18 MW) |
6 |
Rated Head |
− |
427 ft |
7 |
Type of Turbine |
− |
Francis (Vertical) |
8 |
Discharge |
− |
3 × 600 ft3/s = 1800 ft3/s |
9 |
Annual Design Generation |
− |
377.6 GWh |
10 |
Transmission Line |
− |
132 kV Kengtawng-Nansang Line (74) miles 11 kV Kengtawng Line (20) miles |
11 |
Penstock |
− |
2600 ft (f - 15~5 ft) |
Myo Gyi
1 |
Location |
− |
Ywangan Township, Southern Shan Sate |
2 |
Creek |
− |
Zawgyi |
3 |
Construction Starting Date |
− |
2005-2006 |
4 |
Commercial Running Date |
− |
2016 |
5 |
Installed Capacity |
− |
30 MW (2 × 15 MW) |
6 |
Rated Head |
− |
171.9 ft (52.4 m) |
7 |
Type of Turbine |
− |
Francis (Vertical) |
8 |
Discharge |
− |
1836 ft3/ Sec |
9 |
Annual Design Generation |
− |
135.70 GWh |
10 |
Transmission Line |
− |
33 kV (10.g niles). Double Circuit To Taung Taw Kwin Substation |
Shweli No. (1)
1 |
Location |
− |
Nam Hkan Township, Shan Sate |
2 |
River |
− |
Shweli |
3 |
Construction Starting Date |
− |
2002-2003 |
4 |
Commercial Running Date |
− |
2009 |
5 |
Installed Capacity |
− |
600 MW (6 × 100 MW) |
6 |
Rated Head |
− |
981 ft |
7 |
Type of Turbine |
− |
Francis (Vertical) |
8 |
Discharge |
− |
6 × 1328.7 = 7972.2 ft3/s |
9 |
Annual Design Generation |
− |
4022 GWh |
10 |
Transmission Line |
− |
230 kV Shweli-Mansan-To Taung Taw Kwin Substation Shwesaryan Line (1) & (2) (180) miles |
11 |
Low/ High Pressure Pipe Line |
- |
3030 ft × (2) Nos (f -17 ft) |
Tigyit
1 |
Location |
− |
Pin Laung Township, Shan State |
2 |
Company Name |
− |
Wuxi Huaguang Electric Power Engineering Co.,Ltd |
3 |
Project Type |
− |
RBOT |
|
Construction Starting Date |
− |
2001 |
4 |
Commercial Running Date |
− |
24.12.2004 (Machine –I ) 3.5.2005 (Machine-II) |
5 |
Total Installed Capacity |
− |
120 MW (2 × 60 MW) |
6 |
Type of Machine |
− |
Coal-fired Thermal Power Turbine and Generator |
7 |
Annual Design Generation |
− |
600 GWh |
8 |
Transmission Line |
− |
132 kV Tigyit-Lawpita Line (1) & (2) (76.614) miles 132 kV Tigyit-Kalaw Line (1) & (2) (22) miles |