Instruction for Electric Sector


Tasks for Domestic Meter application

  1. Applying to the Relevant Officer in Charge (OIC) / Township Electrical Engineer Office in administrative department with the complete form by House possessor/Consumer/User.
  2. Cashing the designated rate to Finance Department if comply with the required data.
  3. Installation by Officer in Charge (OIC)/Township Electrical Engineer if the house is located within 300 feet from 400V line and the related transformer which is not overload.

 

Tasks for Power Meter application

  1. Applying to the Relevant Officer in Charge (OIC)/ Township Electrical Engineer Office in Administrative Department with  complete form by possessor/Consumer/User who want to use in commercial business.
  2. Cashing the designated commercial rate if the applicant for being to use commercial business.
  3. Cashing the designated rate to Finance Department if execute the required data.
  4. Cashing the designated rate for domestic power meter after receiving commitment signature of House possessor/Consumer/User which is only to use in domestic.
  5. Permission to install by District in Charge (DIC) within 7 days if in line with the required data.

 

Tasks for Private Transformer application

  1. Applying to the Relevant Officer in Charge (OIC) / Township Electrical Engineer Office in administrative department with the complete form by House possessor/Consumer/User.
  2. Preparing the case which is to install private transformer within 7 days and then submitting it to the District in Charge (DIC) from Officer In Charge (OIC)/Township Electrical Engineer.
  3. Submitting that case to the Division Engineer (DE) from District in Charge (DIC)
  4. Submitting that case to Electricity Supply Enterprise Headquarter from Division Engineer (DE) and then permission to install by Electricity Supply Enterprise Headquarter within one month if the application is compiled with the required data.

 

Tasks for Village Electrification Committee (VEC) Application

  1. Applying by the legal Village Electrification Committee.
  2. Signing on understanding of 12 instructions for Village Electrification Committee which is designated by Electricity Supply Enterprise.
  3. Preparing the case by Officer in Charge (OIC) / Township Electrical Engineer and then submit to the District in Charge (DIC).
  4. Submitting that case to the Division Engineer (DE) from District in Charge (DIC)
  5. Submitting that case to Electricity Supply Enterprise Headquarter from Division Engineer (DE) and then permission to install by Electricity Supply Enterprise Headquarter within one month if the application is complied with the required data.

Tasks for System Improvement/System Development by Regional Budget

  1. Preserving the places where need to maintain priority by relevant responsible person to reduce power losses.
  2. Designing the standard specification by Regional Specification In charge Committee
  3. Implementing Under the Ministry's instructions for the village electrification functions by regional budgets and foreign aids.
  4. Submitting to Headquarter if the projects which are already included in Capital Budget.
  5. Prioritizing the projects which are submitted by the membership of Parliament.

 

Tasks for System Breakdown

  1. Opening the Circuit Breakers of Incoming and Outgoing lines by the relevant head person of the substation.
  2. Inspection the 3 phase voltage Level when reenergized for the substation and inform to the representative person and making the float charge for the power transformer.
  3. Distribution to the Customer/User under the normal situation.
  4. Announcement to the Public.

Tasks of replacing for abnormal meters

  1. Replacing the meters which are abnormal conditions by the new one.
  2. Sending the meters which are needed to check to the relevant department.
  3. Refitting by the certified meter.