MINISTRY OF ELECTRIC POWER

Breaking News :

NAY PYI TAW COUNCI


EPGE

Paunglaung

1

Location

 Zayyarthiri Township, NayPyiTaw Territory

2

Creek

Paunglaung

3

Construction Starting Date

1.2.1997

4

Commercial Running Date

2005

5

Installed Capacity

280 MW (70MW × 4 )

6

Rated Head 

340 ft

7

Type of Turbine 

Francis (Vertical)

8

Discharge

4 × 2701.75 ft3/s = 10807 ft3/s

9

Annual Design Generation

911 GWh

10

Transmission Line

230 kV Paunglaung – Pyinmana Line (1) & (2) (11) miles

11

Penstock

263 ft (2) Nos (f - 28 ft)

 

Paunglaung

Upper Paunglaung

1

Location

 (26) Miles East of Pyinmana Township, Naypyitaw Territory

2

Creek

Paunglaung

3

Rated Head 

260 ft

4

Type of Turbine 

Francis (Vertical)

5

Installed Capacity

140 MW (70MW × 2 )

6

Annual Design Generation

454 GWh

Paunglaung

 

 

 

Nan Cho

1

Location

(16)Miles East of Pyinmana Township, NayPyiTaw Territory

2

Creek

Nan Cho

3

Construction Starting Date

2006

4

Commercial Running Date

11.4.2014

5

Installed Capacity

40 MW (20 MW × 2)

6

Rated Head 

328 ft

7

Type of Turbine 

Francis (Vertical)

8

Discharge

1674 ft3/ Sec

9

Annual Design Generation

152 GWh

10

Transmission Line

230kV, Nancho-Paunglaung (7.6) miles

230kV,  Nancho -Upper Paunglaung

11

Penstock

263 ft (2) Nos (f - 28 ft)

Nan Cho


DPTSC

230 kV Transmission Line

Nay Pyi Taw

Sr.

Name of Transmission Line

Conductor

Size

Distance

(Mile)

Number

of Tower

1

 

230 kV Pyinmana - Thaephyu

265/35 sqmm

22.36

117

2

230 kV Thazi -  Shwemyo

795 MCM

63.98

325

3

230 kVShwemyo - Pyinmana

795 MCM

19.72

95

4

230 kVPyinmana - Naypyitaw

605 MCM

12.76

65

5

230 kVPyinmana – Paunglaung (1)

300/25 sqmm

8.32

38

6

230 kVPyinmana – Paunglaung (2)

300/25 sqmm

8.00

34

7

230 kVPaunglaung - Nancho

605 MCM

7.76

39

8

230 kVUpper Paunglaung - Nancho

605 MCM

16.47

77

9

230 kVShwemyo – Naypyitaw (2)

605 MCM

10.84

57

10

230 kVBa Lu Chaung (2) - Shwemyo

795 MCM

102.00

401

 


230 kV Primary Substation (Naypyitaw) (2023, February)

No

substation

Voltage ratio

Capacity

(MVA)

Total

Capacity

(MVA)

Location

1

Naypyitaw (1)

     230/33/11

100

       200

Oattaya Thiri  Township

230/33/11

100

2

Pyinmana

230/33/11

100

160

Pyinmana Township

230/33/11

60

3

Shwemyo

230/33/11

100

100

Tatkone Township

4

Naypyitaw (2)

230/33/11

100

100

Pobba Thiri Township

Total capacity (MVA)

560

 


1. 230 kV Naypyitaw (1) Primary Substation

1. Location

    Oaktayathiri Township, Oaktaya District, Naypyitaw Union Territory

2. Area

    (151) Acre

3. Commissioning Date

    (21-September-2008)

4. Install Capacity               

    230/33/11 kV    100 MVA (Areva, Indonesia)

    230/33/11 kV    100 MVA (AG, Mynamar)

    Total                 200 MVA

5. Transmission Lines and Distribution Feeders

    (A) 230 kV Transmission Lines

               (1) Pyinmana Line

               (2) Taungdwingyi Line

    (B) 33 kV Distribution Feeders

              (1) Substation (6) Feeder

              (2) Substation (2) Feeder

              (3) MWD Audiovisual Feeder

              (4) Min-gone Brick Factory Feeder

              (5) Hluttaw Feeder    

              (6) Wana-theik-deed Feeder

              (7) Government Guest Feeder

              (8) Taung-nyo Feeder

              (9) Substation (3) - 1 Feeder

            (10) Substation (3) - 2 Feeder

6. Distribution Regions

    Naypyitaw Union Territory


2. 230 kV Pyinmana Primary Substation

1. Location

    Pyinmana, Datkhina District, Union Territory

2. Area             

    (32.09) Acre

3. Commissioning Date

     (28-May-1988)

  1. Install Capacity                                       

    230/33/11 kV    100 MVA (Areva, China)

    230/33/11 kV      60 MVA (Takaoka, Japan)

    Total                 160 MVA  

5. Transmission Lines and Distribution Feeders

     (A) 230 kV Transmission Lines

               (1) Naypyitaw (1) Line

               (2) Shwemyo Line

               (3) Paunglaung (1) Line

               (4) Paunglaung (2) Line

               (5) Thaephyu Line

    (B) 33 kV Feeders 

              (1) Phwint-phyo-yae (1) Feeder

              (2) Phwint-phyo-yae (2) Feeder

              (3) Pin-laung (1) Feeder

              (4) Pin-laung (2) Feeder

              (5) A-lar Feeder

              (6) Yae-zin Feeder

              (7) Pyinmana Feeder

              (8) A-lar Airport Feeder      

              (9) Taung-nyo Feeder

              (10) Paunglaung Extension Feeder

              (11) Naypyitaw Airport Feeder                 

6. Distribution Regions

    Datkhinathiri Township, Zabuthiri Township, Pobbathiri Township, Zayarthiri Township, Oaktarathiri Township,

    General Headquarters, Pin-laung Military Regions,Taung-nyo Military Regions, Pyinmana Township, Yae-zin,

     A-lar Township, Thar-witt-hti Township and Lae-way Township


3. 230 kV Shwemyo Primary Substation

1. Location

   Tatt-kone Township, Naypyitaw District, Union Territory   

2. Area                

    (113) Acre

3. Commissioning Date

    (20-April-2009)

4 Install Capacity

230/33/11 kV 100 MVA (Iljin, Korea)

Total             100 MVA

5. Transmission Lines and Distribution Feeders

    (A)  230 kV Transmission Lines

            (1) Thazi Line

            (2) Pyinmana Line

            (3) Naypyitaw (2) Line

            (4) Blue-chaung (2) Line

    (B)  33 kV Distribution Feeder

            (1) MRTV-(1) Feeder

            (2) MRTV-(2) Feeder

            (3) Pin-long (1) Feeder

            (4) Medical Research Feeder

            (5) Tat-kone Feeder

            (6) (6004) Tank Feeder

            (7) Project M/O Feeder

6. Distribution Regions

          MRTV, NPE PPE, Zoology Zone, President Garden, Sugar Factory, Tatkone,Bedstead (300),

          B.E.H.S (20), Pob-ba-thiri (6)  Quarters


4. 230 kV Naypyitaw (2) Primary Substation

1. Location          

    Pobbathiri Township, Oaktarathiri District, Union Territoiy

2. Area             

    (35.56) Acre

3. Commissioning Date

    (30-September-2013)

4. Install Capacity

    230/33/11 kV    100 MVA (Areva, Indonesia)

    Total                100 MVA

5. Transmission Lines and Distribution Feeders

     (A) 230 kV Transmission Lines

               (1) Shwemyo Line

     (B) 33 kV Distribution Feeders

              (1) Substation (11) Feeder

              (2) Sit Mhoot Htam Kwat Tit Quarter Feeder             

6. Distribution Regions

     Pobbathiri Township and Oaktarathiri Township


ESE