MINISTRY OF ELECTRIC POWER

Breaking News :

YANGON DIVISION


EPGE

Renovation Works of the Tharkeyta Power Plant (State Owned)

Project Location                 -    Yangon Region, in the compound of old Tharkeyta Power Plant

Contractor                          -    Marubeni Power and Infrastructure Systems Corporation

Project Type                       -    State Owned

                                                The contract has been signed between Electric Power Generation Enterprise and the Marubeni Power and Infrastructure Systems Corporation to renovate the 3                                                    Gas Turbine Financed by JICA

Machine Type                     -    GT (Frame-V, Mark- II)

Current Capacity                -    GT (3 x 19 MW)

Renovated capacity            -    GT (3 x 21.8MW)

Gas Consumption               -    27 MMCFD

Project Consultant              -    Joint venture between Tokyo Electric Power Services Co.,Ltd & Oriental Consultants Co.,Ltd

Current Status                    -    The renovation work of GT No.(2) had finished and it is operating in accordance with the electricity demand. Currently contractor is executing the renovation work                                                   of GT No.(3) and GT No.(1).

 

Rehabilitation Works of Transmission System in Yangon (Ahlone, Hlawga, Ywama, Tharkayta)

Project Location                 -    Yangon Region (Ahlone, Hlawga, Ywama, Tharkayta

Contractor                         -    Mitsubishi Corporation

Project Implementation       -    EPC (Engineering, Procurement and Construction) contract has been signed between Electric Power Generation Enterprise and Mitsubishi Corporation dated on                                                   29th May, 2018, to rehabilitate the Transmission System of Ahlone, Hlawaga, Ywama and Tharkeyta Sub-Station financed by JICA

Project Consultant              -    Joint Venture between Tokyo Electric Power Services Co.,Ltd & Oriental Consultants Co.,Ltd

Current Status                    -    Currently contractor is importing the substation equipment from the aboard and Implementing the Substation renovation works. Currently renovation work of                                                           Hlawga substation had finished and other 3 substations are under renovation.

 

Rehabilitation, Operation, Maintenance and Management (ROMM) of

Hlawaga Power Plant (Private Owned)

Project Location                 -    Yangon Region, in the compound of old Hlawaga Power Plant

Company                           -    Golden Green Energy Co.,Ltd

Project Type                       -    ROMM (Private Owned)

                                            -    The PPA (Power Purchase Agreement) contract has been signed between Electric Power Generation Enterprise and Golden Green Energy Co.,Ltd dated on                                                          30th  November, 2018, for the Rehabilitation, Operation, Maintenance and Management (ROMM) of Hlawaga Power Plant

Machine Type                     -    GT (Frame-6, Mark- V)

                                             -    STG (V63, CS-3000)

Current Capacity                -    70 MW

Renovated capacity            -    84 MW

Gas Consumption               -    26 MMCFD

Current Status                    -    Because the project is stopped, Electric Power Generation Enterprise and Project Company are discussing to resume the project.

 

Ywama 300MW Combined Cycle Power Plant Project

Project Location                 -    Yangon Division, in the compound of Ywama Power Plant

Company                           -   

Project Type                       -    State Owned (World Bank Loan)

Contracted Capacity           -    300MW

Current Status                    -    Financing Agreement for Ywama Project has been signed between Ministry of Planning and Finance and World Bank dated on 3rd July 2020.

                                         -    EPGE issue the prequalification tender for Contractor dated on 11th June 2020 and close dated on 20th August 2020. EPGE is reviewing the tender documents.

                                         -    EPGE sent the Request for Proposal (RFP) to the Short- listed Consultant date on 28th January 2021.

                                         -    Currently the project is pending because World Bank halted the financing for the World Bank loan projects in Myanmar.

 

Upgrading of 50MW Gas Turbine Power Plant to Combined Cycle Power Plant

Project Location                 -    Yangon Division, in the compound of Thilawa Power Plant

Company                           -   

Project Type                       -    State Owned (JICA Loan No. MY-P32)

Current Status                    -    JICA Loan Agreement No. MY-P32 for the Thilawa Project has been signed between Ministry of Planning and Finance and JICA dated on 31st March 2020. Currently EPGE is preparing the Term of Reference (TOR) for Short-listed Consultant Tender with the JICA.

 

 

 

 

 


DPTSC

230 kV Transmission Line

Yangon Division

Sr.

Name of Transmission Line

Conductor

Size

Distance

(Mile)

Number

of Tower

1

230 kV  Tharyargone - Hlawgar

795 MCM

94.01

477

2

230 kV Hlawgar - Tharkayta

795 MCM

13.85

60

3

230 kV Hlaingtharyar -Kanaung

605 MCM

5.9

36

4

230 kV Kanaung - BayintNaung

605 MCM

1.3

8

5

230 kV Myaungtagar - Hlaingtharyar

605 MCM

22.40

104

6

230 kV Kamarnat - Thanlyn

605 MCM

61.00

272

7

230 kV Kamarnat – Thanlyn

(Thilawa Substation In/Out)

605 MCM

8.4

89

8

230 kV Kamarnat - Myaungtagar

605 MCM

39.97

186

9

230 kV Thanlyn - Tharkayta

605 MCM

7.70

37

10

230 kV Thanlyn – Tharkayta

Dagon (East) Substation In/Out

605 MCM

12.40

103

11

230 kV Hlaingtharyar - Ahlone

605 MCM

14.00

66

12

230 kV Myaungtagar - Wartayar

605 MCM

13.62

69

13

230 kV Ywama - Hlaingtharyar

605 MCM

7.27

49

 

230 kV Primary Substation (Yangon Division) (2023, February)

No

Substation

Voltage ratio(kV)

Capacity (MVA)

Total

Capacity (MVA)

Location

1

BayintNaung

230/66/11

125

250

MaYanGone Township

230/66/11

125

2

Myaungtagar

230/33/11

60

460

Mhawbe Township, Myaungtagarvillage

230/33/11

100

230/33/11

150

230/33/11

150

3

Hlaingtharyar

230/33/11

100

355

Hlaingtharyar Township

230/33/11

100

230/33/11

155

4

Hlawgar

230/33/11

100

475

Mingalardone Township

230/33/11

100

230/33/11

150

230/66/11

125

5

Thanlyin

230/33/11

100

200

Thanlyn Township

230/33/11

100

6

Wartayar

230/33/11

100

200

Shwepyithar Township

230/33/11

100

7

East Dagon

230/66/11

125

250

Dagon Myothit (East)

 

230/66/11

125

8

Kanaung

230/33/11

100

255

Hlaingtharyar

Township

230/33/11

155

9

Ahlone

230/66/11

100

505

Ahlone Township

230/66/11

100

230/66/11

155

230/33/11

150

10

Ayarwon

230/66/11

100

100

Dagon Seik Kan Township, Eastern District

Total capacity (MVA)

3050

 

 

1. 230 kV BaYintNaung Primary Substation

1. Location            

    MaYanGone Township, Yangon (West) District, Yangon Division

2. Area        

    (5.22) Acre

3. Comissioning Date

    (3- December- 2006)

4  Install Capacity           

    230/66/11 kV 125 MVA (Siemens, China)           

    230/66/11 kV 125 MVA  (Siemens, China)

    Total            250 MVA

5. Transmission Lines and Distribution Feeders

    (A) 230 kV Transmission Lines

            (1) Kanaung Line

    (B) 66 kV Transmission Lines

             (1)Sin-malite (1) Line

             (2)Sin-malite (2) Line

             (3)Sein-pan-myaing Line

             (4)Ywama Line

             (5) Sin-malite (3) Line

             (6)Sin-malite (4) Line

             (7) RIR-1 Line

6. Distribution Regions

    Kama-yutTownship, Kyi-myin-taing Township, San-chaung Township, Bahan

    (West) Township, Hlaing(west) Township, Juneangone Township, Insein (north)

 

2. 230 kV Myaungtagar Primary Substation

1. Location            

MyaungtagarVillage, Hmaw-bi Township, Yangan (North) District, Yangon Division

2. Area                  

    (38.708) Acre

3. Commissioning Date

    (28- August-2005)

4  Install Capacity           

    230/33/11 kV     100 MVA (Areva, China)               

    230/33/11 kV      60 MVA (Zaporpzh, Ukaraine)

    230/33/11 kV     150 MVA (Siemens, China)

    230/33/11 kV     150 MVA (Mitsubishi, Japan)

    Total                 460 MVA

5. Transmission Lines and Distribution Feeders

     (A)   230 kV Transmission Lines

               (1) Minhla Line

               (2) Hlawgar Line

               (3) Kamarnat Line

               (4) Hlaingtharyar Line

               (5) Wartayar Line

     (B)   33 kV Distribution Feeders

 (1) Steel Mill (1) Feeder

 (2) Steel Mill (2) Feeder

 (3) Hmaw-bi Feeder

 (4) Defence Factory Feeder

 (5) Kyat-phyu-kan Feeder

 (6) Fertilizer Factory (1) Feeder

 (7) Fertilizer Factory (2) Feeder

 (8)  Steel Industrial Zone-1 Feeder

 (9) Steel Industrial Zone-2 Feeder  

 (10) Steel Industrial Zone-3 Feeder

 (11) Steel Industrial Zone-4 Feeder

 (12) Steel Industrial Zone-5 Feeder

 (13) Steel Industrial Zone-6 Feeder

 (14) Steel Industrial Zone-7 Feeder

                (15) Soe Moe Khaing -2 Feeder

                (16) Tikekyi Feeder

               (17) Phu-gyi Feeder

               (18) Ka-pa-sa (11) Feeder

               (19) Soe Moe Khaing-1 Feeder

                (20) Feeder-10

                (21) Feeder-8

                (22) Feeder-9

                (23) Yangon Crown Feeder

                (24) Yangon Jr Feeder

                (25) Oakkan-Aphyak Feeder

                (26) Myit Yay Tin Feeder

6. Distribution Regions

Hmaw-bi Township, Tike-kyi Township, No (2) Steel Mill, No (4) Fertilizier Factory and Myaungtagar Steel Mill Industrial Zone

 

3. 230 kV Hlaingtharyar Primary Substation

1. Location            

    Hlaingtharyar Township, Yangon (North) District, Yangon Division

2. Area                  

    (32.802) Acre

3. Commissioning Date

    (16-Jun-2006)

4  Install Capacity                                                  

    230/33/11 kV       100 MVA (Siemens, China)          

    230/33/11 kV       100 MVA (Siemens, China)     

    230/33/11 kV       155 MVA (Siemens, Germany)

    Total                  355 MVA

5. Transmission Lines and Distribution Feeders

    (A) 230 kV Transmission Lines

            (1) Athoke Line

            (2) Kanaung Line

            (3) MyaungtagarLine

            (4) Ahlone Line

            (5) Ywama (1) Line

            (6) Ywama (2) Line

            (7) Kyeil Latt Line

    (B) 33 kV Distribution Feeders

            (1) Pan-hlaing Feeder

            (2) Nyaung-done Feeder

            (3) Shwe-lin-pan Feeder

            (4) Htan-ta-bin Feeder

            (5) Kyan-sit-min (1) Feeder

            (6) Kyan-sit-min (2) Feeder

            (7) Hlaingtharyar (1) Feeder

            (8) Hlaingtharyar (2) Feeder

            (9) Zone (1) Feeder

           (10) Zone (2) Feeder (KunChamKone)

           (11) Mya-sein-yaung Feeder

           (12) Shwe-than-lwin Feeder

           (13) Ton-tail Feeder

           (14) Zone (5) Feeder

           (15) Nawaday Feeder

6. Distribution Regions

Hlaingtharyar Township(Nothern District, Nyaung-done Township, Yangon Division

(Ma-Eu-Pin District) , Ayeyarwaddy Division, Ton-tail Township(Southern District), Yangon Division

 

4. 230 kV Hlawgar Primary Substation

1. Location            

    Min-galar-done Township, Yangon (Nothern District), Yangon Division

2. Area                  

    (42.82) Acre (Station Area)

    (1.43) acre   (Residential Area)

3. Commissioning Date

    (1-April-1960)

4  Install Capacity                                                  

    230/33/11    kV   100 MVA         (Areva, Indonesia)

    230/33/11    kV   100 MVA         (Areva, Indonesia)

    230/33/11    kV   150 MVA         (Fuji, Japan)

    230/66/11    kV   125 MVA         (Fortune Electric, Thaiwan)

    Total                 475 MVA         

5. Transmission Lines and Distribution Feeders

    (A) 230 kV Transmissiopn Lines

            (1) Tharyargone Line

            (2)Shwe-taung Line

            (3)Thar-kay-ta Line

    (B) 66 kV Transmission Line

            (1) Ywama Steel Mill Line

            (2) 16 Mile (1)

            (3) 16 Mile (2)

    (C) 33 kV Distribution Feeders

            (1) Palae (1) Feeder

            (2) Kyat-phyu-kan Feeder

            (3) Ahta-yu Feeder

            (4) Myawaddy Feeder

            (5) Hle-gu Feeder

            (6) (14) mile Feeder

            (7) Ma-yan-gone (Aa) Feeder

            (8) Ma-yan-gone (Ab) Feeder

            (9)  Ywama (Ba) Feeder

            (10) Ywama (Bb) Feeder

            (11) Shwe-pyi-thar Feeder

            (12) Shwe-lin-pan Feeder

            (13)  Hlaingtharyar (1) Feeder

            (14) Hlaingtharyar (2) Feeder

            (15) Palae (2) Feeder

            (16) Cocacola Feeder

            (17) Palae (Phaung-gyi) Feeder

            (18) MEC Feeder 

6.Distribution Regions

Min-galar-done Township (Northern District), Shwe-pauk-kan (Easten District) Township,

Min-galar-done (North) District, Inn-sein Township, Junean-gone Township, Oak-kalar(North) Township,

Hle-gu Township, Hmaw-bi Township,Shwe-pyi-tar Township, Htauk-Kyint Township, Hlaingtharyar Township

 

5. 230 kV Thanlyn Primary Substation

1. Location            

ThanlynTownship, Yangon (Southern) District, Yangon Division

2. Area                  

    (6.5) Acre

3. Commissioning Date

    (11-July-2009)

4. Install Capacity

    230/33/11 kV       100 MVA (ABB, Thailand)

    230/33/11 kV       100 MVA (ABB, Thailand)

    Total                  200 MVA

5. Transmission Lines and Distribution Feeders

     (A) 230 kV Transmission Lines

            (1) Thilawa Line

            (2) Tharkayta Line

            (3) East Dagon Line

     (B) 33 kV Distribution Feeders

            (1) Pha-yar-gone Feeder

            (2) Dagon Coast Feeder

            (3) Thone-kwa Feeder

            (4) Myo-ma Feeder

            (5) Phwint-phyo-yae Zone Feeder

            (6) Thilawa (1) Feeder

            (7) Thilawa (2) Feeder

            (8) Thilawa (3) Feeder

            (9) Aungchanthar Feeder

            (10) Star City Feeder

            (11) SEZ (1) Feeder

            (12) SEZ (2) Feeder

6. Distribution Regions

ThanlynTownship, Kyauk-tan Township, Kha-yan Township,

Thone-khwa Township, East Dagon Township

 

6. 230kV Wartayar Primary Substation

1. Location            

    Shwe-Pyi-Thar Township, Yangon (Northern) District, Yangon Division

  1. Area        

    (23.5)Acre

3. Commissioning Date

    (23-August-2013)

  1.  

    230/33/11 kV       100 MVA (Areva, China)

    230/33/11 kV       100 MVA (ILJIN, Korea)

    Total                  200 MVA         

5. Transmission Lines and Distribution Feeders

     (A)   230 kV Transmission Line

            (1) Myaungtagar Line

            (2) HlaingTharyar Line

            (3) ) Ywama Line

     (B)   33 kV Distribution Feeders

            (1) Myanmar-paung-chain Feeder

            (2) Feeder (2)

            (3) Feeder (3)

            (4) Feeder (4)

            (5) Feeder (5)

            (6) Feeder (6)

            (7) Feeder (7)

6. Distribution Regions

Shwe-pyi-thar Township, Thar-du-kanIndustrialZone, Wartayar Industrial Zone

 

1.230 kV East Dagon Primary Substation

1.Location  

    East DagonTownship, Yangon Division

2.Area                                     

    (25.282) Acre

3. Commissioning Date

    (8-August-2016)

4.Install Capacity                    

    230/66/11 kV    125 MVA         (Hyundai, Korea)

    230/66/11 kV    125 MVA         (Hyundai, Korea)

    Total                250 MVA             

5. Transmission Lines and Distribution Feeders

     (A)   230 kV Transmission Lines

            (1) Thanlyn Line

            (2) Thakata Line

     (B)   66 kV Transmission Lines

            (1) Dagon (East) Line    

            (2) Dagon (south) Line   

            (3) Kone-paday-thar No (1) Line

            (4) Kone-paday-thar No (2) Line

            (5) No (3) Line

            (6) No (5) Line 

6. Distribution Regions

Dagon (East) Township, Dagon (South) Township, Dagon(North)Township,

Dagon Coast Township

 

1.230 kV Kanaung Primary Substation

1.Location 

     Hlaingtharyar Township, Yangon Northern District, Yangon Division

2. Area        

     (4.06) Acre

3. Commissioning Date

     (11-July-2017)

4. Install Capacity

     230/33/11 kV, 100 MVA (ILJIN, Korea)

     230/33/11 kV, 155 MVA   (Siemens, Germany)

     Total              255 MVA

5. Transmission Lines and Distribution Feeders

(A) 230 kV Transmission Lines

            (1) Hlaingtharyar Line

           (2) Bayintnaung Line

(B) 33 kV Distribution Feeders

            (1) Engineer Office (1) Feeder

            (2) Engineer Office (2) Feeder

            (3) Kwan-changone Feeder

            (4) Kha-naung-to Feeder

            (5) FMI Feeder

            (6) Zone-7 Feeder

6. Distribution Regions

Hlaing thar yar Township(Northern District), Kwan-changone Township

(Sorthern District), Kha-naung-to Township (Sorthern District)

 

9. 230 kV Ahlone Primary Substation

1. Location  

     Ahlone Township, Yangon Division

2.  Area                 

     (9.047) Acre (Within Ahlone Factory Area)

3. Comissioning Date

     (21-February-2012)

4.  Transformer Capacity           

     230/66/11kV   100 MVA (Areva, Indonesia)

     230/66/11kV   100 MVA (Areva, Indonesia)

     230/66/11kV   155 MVA (Daihen, Thailand)

     230/33/11kV   150 MVA (Mitsubishi,Japan)

     Total              505 MVA

5. Transmission Lines and Distribution Feeders

     (A) 230 kV Transmission Lines

            (1)  Hlaingtharyar Line  

     (B)   66 kV Transmission Lines

            (1)   CEEC STG Line

            (2)   MEC Line

            (3)   Sin-Ma-Light (2) Line

            (4)   Thi-dar (1) Line

            (5)   Thi-dar (2) Line

            (6)   Maw-Tin Line

            (7)   Myanmar Railway Line

            (8)   MRTV-3 Line

            (9)  HongHai (New)Line

            (10)  Hospital Complex-1 Line

            (11) Hospital Complex-2 Line

            (12) CEEC GT Line

     (C)   33 kV Distribution Feeders

            (1)   Hong-Hing (1) Feeder

            (2)   Hong-Hing (2) Feeder

            (3)   Hong-Hing (1) Feeder

            (4)   Hong-Hing (2) Feeder

6.  Distribution Regions

Kyaut-Tan-Tar, Daw-pong, Tar-mgwe, Yankin, Dagon, Kyee-Myin-Taing, Lan-Ma-Taw,

Pazon-taung, Ba-be-tan, Dagon Quayside, Thin-gan-kyun, Ahlone, Hlaing, Bo-ta-htaung,

Min-galar-Taung-nyunt, Ba-han, South Oak-kalar, San-Chaung, Kamar-Yurt Townships

 

10. 230 kV Ayarwon Primary Substation

1. Location  

     Dagon Seik Kan Township, Eastern District, Yangon Division

2.  Area                 

     (11.95) Acre

3. Comissioning Date

     (27-November-2020)

4.  Transformer Capacity           

     230/66/11kV   100 MVA (ILJIN, KOREA)

     Total              100 MVA

5. Transmission Lines and Distribution Feeders

     (A) 230 kV Transmission Lines

            (1)  Thanlyin Line

            (2)   East Dagon Line

     (B)   66 kV Transmission Lines

            (1)   Ayarwon Line

            (2)   Yuzana Line

6.  Distribution Regions

     Yuzana Housing, Dagon (Myo Thit) Sake Kam


ESE