MINISTRY OF ELECTRIC POWER

Breaking News :

MAGWAY DIVISION


EPGE

Mone Chaung

1

Location

Satotaya Township, Magway Region

2

River

Mone

3

Construction Starting Date

1997~1998

4

Commercial Running Date

2004

5

Installed Capacity

75 MW (3 × 25 MW)

6

Rated Head 

124.68 ft

7

Type of Turbine 

Francis (Vertical)

8

Discharge

3 × 2010 ft3/s = 6030 ft3/s

9

Annual Design Generation

330 GWh

10

Transmission Line

132 kV Mone-Chauk Line (61) miles

11

Penstock

450 ft (f - 13.9 ft)

Mone Chaung


Kyeeon Kyeewa

1

Location

 Pwint Phu Township, Magway Region

2

Creek

Mone

3

Construction Starting Date

2002-2003

4

Commercial Running Date

2012

5

Installed Capacity

74 MW (2 × 37 MW)

6

Rated Head 

112.5 ft

7

Type of Turbine 

Kaplan (Vertical)

8

Discharge

2 × 2148 ft3/s = 4296 ft3/s

9

Annual Design Generation

370 GWh

10

Transmission Line

132 kV Minbu Line (43) miles

11

Penstock

No (1) - 853 ft

No (2) - 914 ft

(f -18 ft)

Kyeeon Kyeewa


Myitthar

1

Location

 Gangaw Township, Magway Region

2

River

Myitthar

3

Construction Starting Date

2002-2003

4

Commercial Running Date

9.1.2017

5

Installed Capacity

40 MW (2 × 20 MW)

6

Rated Head 

74 ft

7

Type of Turbine 

Kaplan (Vertical)

8

Discharge

2754 ft3/ Sec

9

Annual Design Generation

170 GWh

10

Transmission Line

66 kV(MyitThar- Gangaw) (14.9) miles Double Circuit

Myitthar


Kyunchaung

1

Location

Pakautku Township, Magwe Region

2

Commercial Running Date

11.3.1974 (Machine -1)

20.3.1974 (Machine-2)

4.6.1974 (Machine -3)

3

Total Installed Capacity

54.30 MW (3 × 18.1MW)

4

Type of Machine 

 JOHN BROWN Mark-I, Frame-5 Gas Turbine

5

Construction Cost

MMK  - 61.6 million

Kyunchaung

 


Mann

1

Location

Minbu Township, Magwe  Region

2

Commercial Running Date

22.8.1980 (Machine -1)

8.12.1980 (Machine-2)

3

Total Installed Capacity

36.90 MW (2× 18.45 MW)

4

Type of Machine 

 GE Frame 5 (Industrial Outdoor Package Type)

5

Construction Cost

MMK -  134.6 million

Mann


DPTSC

230 kV Primary Substation (Magway Division) (2022, August)

No

Substation

Voltage ratio

Capacity

(MVA)

Total

Capacity

(MVA)

Location

1

Chaunggu

230/66/11

100

100

Pakokku District,

Pauk Township

2

Taungdwingyi

230/132/11

80

200

Taungdwingyi Township

230/132/11

60

132/66/11

60

230 kV, Total capacity (MVA)

300

 

 

132 kV Primary Substation (Magway Division) (2022, August)

No

Substation

Voltage ratio

Capacity

(MVA)

Total

Capacity

(MVA)

Location

1

Chauk

 

132/11

18

118

Chauk Township, Magway District

 Magway Division

132/66/11

100

2

Sidoktaya

132/66/11

45

45

Minbu District,

Sidoktaya Township

3

Tanyaung

132/66/11

60

60

Minbu District,

Salin Township

4

Buddhagone

132/66/11

60

60

Pakokku District, Magway Division

5

Magway

132/33/11

60

105

Magway Township

132/33

45

132kV Total capacity (MVA)

388

 

 

1. 230 kV Chaunggu Primary Substation

1. Location 

     Pauk Township, Pakokku District, Magway Division

2. Area

     (38.58) Acre

3. Commissioning Date

    (27-February-2012)

  4. Install Capacity 

     230/66/11 kV   100 MVA (Areva, Indonesia)      

     Total               100 MVA

5. Transmission Lines and Distribution Feeders

     (A)   230 kV Transmission Lines

                (1) Nyaungpingyi Line

     (B)   66 kV Transmission Lines

               (1) Kyaw (1) Line

               (2) Kyaw (2 Line

               (3) Pauk (1) Line

               (4) Pauk (2) Line

               (5) Min-tapp Line

6. Distribution Regions

 Ka-pa-sa (24), Ka-pa-sa (23), Kyaw, Gant-gaw Township, Hakhar Township, Phlan

Township, Kalay Township, Khaing-Lann Township, Pauk Township, Kyauk-htu

Township, Saw Township, Htee-linn Township and Min-tapp Township

 

2. 230 kV Taungdwingyi Primary Substation

1. Location                              

     Taungdwingyi Township, Magway District, Magway Division

2. Area                                    

     (61.11) Acre

3. Commissioning

     (7-July-1987)

4. Install Capacity

     230/132/11 kV    80 MVA (Fuji, Japan)

     230/132/11 kV    60 MVA (Trafo Union, Germany)

     132/66/11 kV      60 MVA (Iljin, Korea)

          Total           200 MVA

5. Transmission Lines and Distribution Feeders

     (A) 230 kV Transmission Lines

               (1) Shwetaung Line

               (2) Thapyaywa Line

               (3) Naypyitaw Line

               (4) Shwetaung (1) Line

               (5) Shwetaung (2) Line

     (B) 132 kV Transmission Lines

               (1) Magway Line        

     (C) 66 kV Transmission Lines

               (1) Ka-pa-sa (8) Feeders

               (2) Ka-pa-sa (17) Feeders

               (3) Ka-pa-sa (18) Feeders

              (4) Myothit Line

     (D) 11 kV Distribution Feeders

               (1) Taungtwingyi Feeder

               (2) (Myoe-thit) + (Nat-Mauk) Feeder

               (3)  Set thwar Feeder

6. Distribution Regions

          Taungdwingyi Townships, Myoethit, Nat-mauk, Aung-lan and Tha-yet Townships

 

1. 132 kV Chauk Primary Substation

1. Location 

     Chauk Township, Magway District, Magway Division

2. Area

     (70.47) Acre

3. Commissioning Date

     (20- October-1969)

4.  Installed Capacity

     132/11     kV        18 MVA (National, Norway)

     132/66/11 kV      100 MVA (AG, Myanmar)

     Total               118 MVA

5. Transmission Lines and Distribution Feeders

     (A) 132 kV Transmission Lines

               (1) Thazi Line

               (2) Magway Line

               (3) Tanyaung Line

               (4) Kyunchaung Line

     (B) 66 kV Transmission Lines

              (1) Kyauk-pa-daung Line

              (2) Pakhannge Line

              (3) Nyaung-oo Line

              (4) Salay Fertilizer Factory Line

              (5) WarZe Line

              (6) GwayCho Line

     (C) 11 kV Distribution Feeders

              (1) ChaukFeeder

              (2) Bagan Feeder

              (3) Myanma Oil Feeder

              (4) Gway Cho Feeder

              (5) Hydrogenperoxide Factory Feeder

              (6) Porcelain Insulator Factory Feeder

              (7) SalayFeeder

              (8) YezatFeeder

              (9) City Development Comittee Feeder

              (10) Feeder (2)

6. Distribution Regions

Nyaung-ooTownship,Bagan Township, Kyauk-pa-daung Township in Mandalay Division,

Pakhannge, Nine Canal River Water Pump, Salay Fertilizer Factory, Seikphyu Township,

Myanma Oil, Chauk Township, Gwaycho Township, Hydrogenperoxide Factory, Advanced

Porcelain Insulator Factory, Salay Township, Zeecho Water Pump in Magway Division

 

2. 132 kV Sidoktaya Primary Substation

1. Location 

     Aukpone Village, Sidoktaya Township, Minbu District, Magway Division

2. Area

      (14.32) Acre

3. Commissioning Date

     (9-August-2010)

4.  Installed Capacity

     132/66/11 kV,   45 MVA (I1jin, Korea)

     Total               45 MVA

5. Transmission Lines and Distribution Feeders

     (A) 132 kV Transmission Lines

               (1) Mone- (Saydoktaya) Line          

     (B) 66 kV Transmission Lines

              (1) Ka-pa-sa (20) Line

     (C) 11 kV Distribution Feeders

              (1) Sidoktaya Township Office Feeder

6. Distribution Regions

Ka-pa-sa (20), Sidoktaya Township

 

3. 132 kV Tanyaung Primary Substation

1. Location 

     Tanyaung Village Group, Salin Township, Minbu District, Magway Division

2. Area

     (19.97) Acre

3. Commissioning Date

     (12-October-2008)

4.  Installed Capacity

     132/66/11 kV,   60 MVA  (Iljin, Korea)

     Total              60 MVA

5. Transmission Lines and Distribution Feeders

     (A)   132 kV Transmission Lines

               (1) Mone Line

               (2) Chauk Line                     

     (B)   66 kV Transmission Lines

              (1) Ka-pa-sa (21) Line

              (2) Ka-pa-sa (22) Line

              (3) Tanyaung Electric River Pump Line

              (4) Sate Phyu Line

              (5) Long shae Line

6. Distribution Regions

Ka-pa-sa (21) Factory, Ka-pa-sa (22) Factory, Tanyaung Electric River Pump

 

4. 132 kV Buddhagone Primary Substation

1. Location

     Pakokku Township, Pakokku District, Magway Division

2. Area

     (27.55) Acre

3. Commissioning Date

     (20-April-2015)

4.  Installed Capacity

     132/66/11 kV,   60 MVA (ILJIN, Korea)

      Total               60 MVA

5. Transmission Lines and Distribution Feeders

     (A)   132 kV Transmission Lines

               (1) Kyun-chaung Line

               (2) Nyaungpingyi Line

     (B)   66 kV Transmission Lines

              (1) Pakokku Line

              (2) Kyi Village Electric River Pump Line

              (3) Nonge-poe Electric River Pump Line

              (4) PaKhamGyi Line

6.  Distribution Regions

     Pakokku Township, Ye-sa-kyo Township

 

5. 132 kV Magway Primary Substation

1. Location

     Magway Township, Magway District, Magway Division

2. Area

     (52.01) Acre

3. Commissioning Date

     (19-April-1988)

4.  Installed Capacity

     132/33/11 kV,   60 MVA (Minel, Yugoslavia)

     132/33 kV,         45 MVA (Chint, China)

       Total                85 MVA

5. Transmission Lines and Distribution Feeders

     (A)   132 kV Transmission Lines

               (1) Chauk Line

               (2) Taungdwingyi Line

               (3) Mann Line                      

     (B)   33 kV Distribution Feeders

              (1) MagwayFeeder

              (2) Ye-nan-ChaungFeeder

              (3) Ywar-monFeeder             

              (4) Myin kin Feeder

              (5) Industry (2) Car Factory Feeder  

              (6) ThaPhamSake Feeder

              (7) V-Power Feeder 1

              (8) V-Power Feeder 2            

     (C)   11 kV Distribution Feeders

              (1) Magway Feeder

              (2) Tank Feeder

              (3) Irrigation Feeder

              (4) Myin-Kun Feeder

              (5) Industry Feeder

              (6) Air Force Feeder

              (7) Computer Feeder

              (8) Medical University Feeder

6.  Distribution Regions

     Magway Township, Ye-nan-Chaung Township


ESE