1 |
Location |
− |
Bago Township, Bago Region |
2 |
River |
− |
Bago |
3 |
Construction Starting Date |
− |
1.1.1994 |
4 |
Commercial Running Date |
− |
2000 |
5 |
Installed Capacity |
− |
20 MW (2 × 10 MW) |
6 |
Rated Head |
− |
89.9 ft |
7 |
Type of Turbine |
− |
Kaplan (Vertical) |
8 |
Discharge |
− |
2 × 1539 ft3/s = 3078 ft3/s |
9 |
Annual Design Generation |
− |
76 GWh |
10 |
Transmission Line |
− |
66 kV Zaungtu-Kamanat Line (45.6) miles |
11 |
Penstock |
− |
672 ft (2) Nos (f - 16.4 ft) |
1 |
Location |
− |
Kyauktaga Township, Bago Region |
2 |
Creek |
− |
Yenwe |
3 |
Construction Starting Date |
− |
2001 |
4 |
Commercial Running Date |
− |
2007 |
5 |
Installed Capacity |
− |
25 MW (2 × 12.5 MW) |
6 |
Rated Head |
− |
187 ft |
7 |
Type of Turbine |
− |
Francis (Vertical) |
8 |
Discharge |
− |
2 × 883 ft3/s = 1766 ft3/s |
9 |
Annual Design Generation |
− |
123 GWh |
10 |
Transmission Line |
− |
33 kV Yenwe-Thayagone Line 1) & (2) (18.5) miles 11 kV Dam Line (13.5) miles |
11 |
Penstock |
− |
508 ft (f - 18 ft) |
1 |
Location |
− |
Oaktwin Township, Bago Region |
2 |
Creek |
− |
Kabaung |
3 |
Construction Starting Date |
− |
2002-2003 |
4 |
Commercial Running Date |
− |
2008 |
5 |
Installed Capacity |
− |
30 MW (2 × 15 MW) |
6 |
Rated Head |
− |
152 ft |
7 |
Type of Turbine |
− |
Francis (Vertical) |
8 |
Discharge |
− |
2 × 1395 ft3/s = 1766 ft3/s |
9 |
Annual Design Generation |
− |
120 GWh |
10 |
Transmission Line |
− |
33 kV Kabaung-Taung Oo Line (1) & (2) (15) miles |
11 |
Penstock |
− |
210 ft (f - 21 ft) |
Shwegyin
1 |
Location |
− |
Shwegyin Township, Bago Region |
2 |
Creek |
− |
Shwegyin |
3 |
Construction Starting Date |
− |
2002-2003 |
4 |
Commercial Running Date |
− |
2011 |
5 |
Installed Capacity |
− |
75 MW (4 × 18.75 MW) |
6 |
Rated Head |
− |
135.8 ft |
7 |
Type of Turbine |
− |
Francis (Vertical) |
8 |
Discharge |
− |
4 × 1900 ft3/s = 7600 ft3/s |
9 |
Annual Design Generation |
− |
262 GWh |
10 |
Transmission Line |
− |
230 kV Thayagone Line miles (25) miles 11 kV Madauk Line (11) miles |
11 |
Penstock |
− |
1100 ft , (2) Lines (f - 25 ft) |
1 |
Location |
− |
Phyu Township, Bago Region |
2 |
Creek |
− |
Kun |
3 |
Construction Starting Date |
− |
2002-2003 |
4 |
Commercial Running Date |
− |
2012 |
5 |
Installed Capacity |
− |
60 MW (3 × 20 MW) |
6 |
Rated Head |
− |
347 ft |
7 |
Type of Turbine |
− |
Francis (Vertical) |
8 |
Discharge |
− |
3 × 777 ft3/s = 2331 ft3/s |
9 |
Annual Design Generation |
− |
190 GWh |
10 |
Transmission Line |
− |
230 kV Kun-Taungoo Line (37.304) miles 230 kV Kun-Thayagone Line (30.82) miles |
11 |
Penstock |
− |
1295 ft (f - 15 ft) |
1 |
Location |
− |
Taungoo Township, Bago Region |
2 |
Creek |
− |
Thauk Ye Khat |
3 |
Construction Starting Date |
− |
2007-2008 |
4 |
Commercial Running Date |
− |
2013 |
5 |
Installed Capacity |
− |
120 MW (3 × 40 MW) |
6 |
Rated Head |
− |
269 ft |
7 |
Type of Turbine |
− |
Francis (Vertical) |
8 |
Discharge |
− |
3 × 2489.3 ft3/s = 7468 ft3/s |
9 |
Annual Design Generation |
− |
604 GWh |
10 |
Transmission Line |
− |
230 kV Taungoo Line (13.09) miles |
11 |
Penstock |
− |
1972 ft f - 28 ft, (1) No |
1 |
Location |
− |
(7) miles West of Phyu Township, Bago Region |
2 |
Creek |
− |
Phyu |
3 |
Installed Capacity |
− |
40 MW (2 × 20 MW) |
4 |
Rated Head |
− |
337 ft |
5 |
Type of Turbine |
− |
Francis (Vertical) |
6 |
Annual Design Generation |
− |
120 GWh |
1 |
Location |
− |
Shwe Taung Township, Bago Region(Western) |
2 |
Commercial Running Date |
− |
16.2.1982 (Machine -1) 5.6.1982 (Machine-2) 16.4.1984 (Machine -3) |
3 |
Total Installed Capacity |
− |
55.35 MW (3 × 18.45 MW) |
4 |
Type of Machine |
− |
Gas Turbine GE Frame 5 (JOHN BROWN Co., Ltd ) |
230 kV Transmission Line
Bago Division
Sr. |
Name of Transmission Line |
Conductor Size |
Distance (Mile) |
Number of Tower |
1 |
230 kV Taungoo- Phyu-Kun- Tharyargone(1) |
795 MCM |
60.55 |
307 |
2 |
230 kV Phyu Plant In/Out |
795 MCM |
5.00 |
26 |
3 |
230 kV Kun Plant In/Out |
795 MCM |
3.61 |
20 |
4 |
230 kVBa Lu Chaung (2) - Taungoo |
795 MCM |
95.52 |
383 |
5 |
230 kV Shwetaung - Minhla |
605 MCM |
65.39 |
270 |
6 |
230 kV Minhla - Myaungtagar |
605 MCM |
62.96 |
252 |
7 |
230 kV Shwetaung - Taungdwingyi |
605 MCM |
98.12 |
384 |
8 |
230 kV Shwetaung(Myaungtagar)-Hlawgar |
605 MCM |
19.14 |
84 |
9 |
230 kV Thaephyu - Taungoo |
265/35 sqmm |
40.28 |
209 |
10 |
230 kV Kamarnat - Sittaung |
605 MCM |
36.60 |
136 |
11 |
230 kVTaungoo – Tharyargone (2) |
605 MCM |
60.10 |
266 |
12 |
230 kVTharyargone – Kamarnat (1)+(2) |
605 MCM |
58.80 |
260 |
13 |
230 kVShwekyin - Tharyargone |
605 MCM |
25.62 |
106 |
14 |
230 kVShwetaung- Oakshinpin |
605 MCM |
25.60 |
111 |
15 |
230 kVShwetaung - Myaungtagar |
605 MCM |
131.61 |
554 |
16 |
230 kV Oakshinpin - Toungup |
795 MCM |
54.41 |
206 |
17 |
230 kV Taungdwingyi – Shwetaung (D/C) |
605 MCM |
104.00 |
429 |
66 kV Transmission Line
Bago Division
Sr. |
Name of Transmission Line |
Conductor Size |
Distance (Mile) |
Number of Tower |
1 |
66 kV Shwetaung - Pyi |
336.4 MCM |
9.64 |
55 |
2 |
66 kV Shwetaung-Textile industry |
100 sqmm |
1.00 |
12 |
3 |
66 kV Shwetaung- Nuthmaw |
266.8 MCM |
4.00 |
46 |
4 |
66 kV Zaungtoo - Kamarnat |
185 sqmm |
45.25 |
646 |
5 |
66 kV Shwetaung – Hsintae |
397.5 MCM |
11.50 |
133 |
6 |
66 kV Hsintae – Nyaungchayhtauk |
397.5 MCM |
20.00 |
259 |
7 |
66 kV Oakshinpin-(Kapasa-6) |
336.4MCM |
4.40 |
32 |
8 |
66 kV Hsintae - Oakshinpin |
397.5 MCM |
17.30 |
282 |
9 |
66 kV Oakshinpin - Mathone |
397.5 MCM |
12.20 |
188 |
10 |
66 kV Kasala (5) - Kwinhla |
266.8 MCM |
0.94 |
13 |
11 |
66 kV Kamyaing – kapasa (5) |
336.4 MCM |
2.50 |
33 |
12 |
66 kV Shwetaung-Kyaukswyalkyoe |
397.5 MCM |
32.00 |
448 |
13 |
66 kV Shwetaung-Paukkhaung |
795 MCM |
44.00 |
677 |
33 kV Transmission Line
Bago Division
Sr. |
Name of Transmission Line |
Conductor Size |
Distance (Mile) |
Number of Tower |
1 |
33 kV Yenwe - Tharyargone |
397.5MCM |
17 |
336 |
2 |
33 kV Khapaung – Taungoo (1) |
95sqmm |
15.57 |
300 |
3 |
33 kV Khapaung – Taungoo (2) |
400/35sqmm |
15.57 |
286 |
230 kV Primary Substation (Bago Division) (2022, September)
No |
Substation |
Voltage ratio (kV) |
Capacity (MVA) |
Total Capacity (MVA) |
Location |
1 |
Kamarnat |
230/33/11 |
100 |
160 |
Bago District, Bago Township |
230/33/11 |
60 |
||||
2 |
Taungoo |
230/33/11 |
100 |
100 |
Oaktwin Township |
3 |
Tharyargone |
230/33/11 |
100 |
100 |
Bago District, Kyauktagar township |
4 |
Thaephyu |
230/33/11 |
100 |
100 |
Yaetarshae township, Myohla, Thaephyu village |
5 |
Oakshinpin |
230/66/11 |
100 |
100 |
Pyi district, Pantaung township, Oakshinpin |
6 |
Minhla |
230/33/11 |
100 |
100 |
Tharyarwady district, Minhla Township Oakshinpin |
7 |
Binda |
230/33/11 |
60 |
60 |
Nyaunglaybin Town ship, Bago Division |
Total capacity (MVA) |
720 |
|
1. 230 kV Kamarnat Primary Substation
1. Location
Bago Township, Bago District, Bago Division
2. Area
(98.77) Acre
3. Commissioning Date
(1-July-1995)
4. Transformer Capacity
230/33/11 kV 100 MVA (Areva, Indonesia)
230/33/11 kV 60 MVA (ABB, Sweden, Thailand)
Total 160 MVA
5. Transmission Lines and Distribution Feeders
(A) 230 kV Transmission Lines
(1) Tharyargone Line
(2) Binder Line
(3) Thanlyn Line
(4) Sittaung Line
(5) Myaungtagar Line
(B) 66 kV Transmission Line
(1) Zaung-tu Line
(C) 33 kV Distribution Feeders
(1) Bago (1) Feeder
(2) Bago (2) Feeder
(3) Nyaung-inn Industrial Zone (1) Feeder
(4) Nyaung-inn Industrial Zone (1) Feeder
(5) Sittaung (Wall) Feeder
(6) Chin-su Industrial Zone Feeder
(7) Phayar-kyi+Aye-thukha
(8) FeederThaenatpin Feeder
(9) Myanmar Economic Corporation Feeder
6. Distibution Regions
Bago Township, Phayar-kyi Township, Aye-thu-kha Township,
Tha-nut-pin Township, Inn-takaw Township and Kaw
2. 230 kV Taungoo Primary Substation
1. Location
Oak-twin Township, Taung-gu District, Bago Division (East)
2. Area
(21.16)Acre
3. Commissioning Date
(15-June-1963)
4. Install Capacity
230/33/11 kV 100 MVA (ABB, Sweden)
Total 100 MVA
5. Transmission Lines and Distribution Feeders
(A) 230 kV Transmission Lines
(1) Law-pita Line
(2) Thaephyu Line
(3) Tharyargone (1) Line
(4) Tharyargone (2) Line
(5) Thaukyaekhat Line
(B) 33 kV Distribution Feeders
(1) Southern General Headquarter (South Division) Feeder
(2) Taungoo(Rakhine Su) Feeder
(3) Zayyawaty Feeder
(4) Sugar Factory Feeder
(5) Htan-ta-pin Feeder
(6) Kha-paung (1) Feeder
(7) Kha-paung (1) Feeder
(8) Theinoo Feeder
(C) 11 kV Distribution Feeders
(1) U-yin-taw Lumbertard Feeder
(2) Wae-daunt Feeder
(3) Nat-sin-gone Feeder
(4) Line office+ Hydro Feeder
6. Distribution Regions
TaungooTownship, Kay-tu-matiMyoeThit, Htan-ta-pin Township, Oak-twin Township,
Kywe-pwe Township, Zay-ya-waty Township, Tan-taung-gyi Township, Tan-taung-lay Township
3. 230 kV Tharyargone Primary Substation
1. Location
Kyauk-Tan-Khar Township, Bago District, Bago Division
2. Area
(108.26) Acre
3. Comissioning Date
(12-December-2006)
4. Install Capacity
230/33/11kV, 100 MVA (GE, Indonisia)
Total 100 MVA
5. Transmission Lines and Distribution Feeders
(A) 230 kV Transmission Lines
(1) Taungoo (1) Line
(2) Taungoo (2) Line
(3) Kamarnat (1) Line
(4) Kamarnat (2) Line
(5) Hlawgar Line
(6) Shwekyin Line
(B) 33 kV Distribution Feeders
(1) Yenwe (1) Feeder
(2) Yenwe (2) Feeder
(3) Daik-Oo Feeder
(4) Pyuu Feeder
6. Distribution Regions
Pyuu Township, Fa-Doo Township , Nyaung-Lay-Pin Township , Purn-Tan_Sar Township ,
Daik_Oo Township, Kyauk-Tan_KharTownship,Pell-Nwe-Kone Township, Ka-Nyut-Koon
Township, Nat-Thann-Kun Township, Aung-Myin Township
4. 230 kV Thaephyu Primary Substation
1. Location
Myoe-Hla Township, Yae-Tar-Shay Township, TaungooDistrict, Bago Division
2. Area
(42.95) Acre
3. Comissioning Date
(24-December-2007)
4. Transformer Capacity
230/33/11 kV 100 MVA (Areva, China)
Total 100 MVA
5. Transmission Lines and Distribution Feeders
(A) 230 kV Transmission Lines
(1) Pyinmana Line
(2) Taungoo Line
(B) 33 kV Distribution Feeders
(1) Thar-gara Industrial Zone (1) Feeder
(2) Thar-gara Industrial Zone (2) Feeder
(3) Paper Chemistry (1) Feeder
(4) Paper Chemistry (2) Feeder
(5) Max Myanmar Feeder
(6) (Yae-Ni)-(Yae-Tar-Shay) Feeder
(7) Industry-Porcelain Feeder
(8) Brick Factory (Pan-Tin) Feeder
(9) Lei-Way Cantonment+ River Water Pump Feeder
(10) Air Raid Defence Feeder
6. Distribution Regions
Yae-Ni Township, Myoe-Hla Township, Thargara Township,
Yae-Tar-Shay Township , Thar-Witt-Htee Township
5. 230 kV Oakshinpin Primary Substation
1. Location
Pan-Taung Township, Pyay District, Western Bago Division
2. Area
(50.51) Acre
3. Comissioning Date
(6-March-2010)
4. Transformer Capacity
230/66/11kV 100 MVA (Areva, China)
Total 100 MVA
5. Transmission Lines and Distribution Feeders
(A) 230 kV Transmission Lines
(1) Shwetaung Line
(2) Toungup Line
(B) 66 kV Transmission Lines
(1) Nyaung-Chay-Htaut Line
(2) Kan-Ma Line
(3) Sin-Tel Line
(4) Ma-Thone Line
(5) Myan-Aung Line
(6) Ka-Myaing Line
6. Distribution Regions
Oakshinpin Township, Pann-Taung Township, Min-Tone Township,
Kan-Ma Township, Myan-Aung Township, Ka-Pa-Sa(3,5,6,9,16)
6. 230 kV Minhla Primary Substation
1. Location
Minhla Township, Thar-yar-wady District, Bago Division
2. Area
(50.41) Acre
3. Commissioning Date
(31-April-2013)
4. Install Capacity
230/33/11 kV 100 MVA (LEEEC, China)
Total 100 MVA
5. Transmission Lines and Distribution Feeders
(A) 230 kV Transmission Lines
(1) Shwetaung Line
(2) Myaungtagar Line
(B) 33 kV Distribution Line
(1) Zegone Feeder
(2) ThoneSae Feeder
(3) Moe nyo Feeder
(4) LatPaDan Feeder
6. Distribution Regions
Moe-nyoTown, Owe-the-kone Town, Aye-mya-thar-yar, Oak-pho,
Kyoe-pin-kauk, Zee-gone and Nat-ta-lin Township
7. 230 kV Bindar Primary Substation
1. Location
Nyaunglaybin Township, Bago District (east), Bago Division
2. Area
(29.18) Acre
3. Commissioning Date
(25-April-2020)
4. Install Capacity
230/33/11 kV 60 MVA (Hitachi, Japan)
Total 60 MVA
5. Transmission Lines and Distribution Feeders
(A) 230 kV Transmission Lines
(1) Tharyargone Line
(2) Kamarnat Line
(B) 33 kV Distribution Line
(1) Dike Oo Feeder
(2) Nyaung-lay-bin Feeder
6. Distribution Regions
Nyaung-lay-bin Township, Dike Oo Township